Master-planned building in Missouri City began with Quail Valley in the late 1960s and ran into the 2000s, with Lake Olympia and Lakes of Brightwater among the communities that followed. A Quail Valley house from the first years may have a galley or L-shaped kitchen with a soffit above the upper cabinets, which sets how tall a full-height backsplash can run.
The five stones we cut
We cut and install five materials, and each one fits a different kind of kitchen. Granite is natural stone, quarried mostly in Brazil and India. It handles normal pan heat and resists scratching well, and it needs a penetrating sealer. Quartz is engineered: about 90 percent ground quartz bound with resin and pigment. It never needs sealing, and its pattern holds from one slab to the next. The resin is its weak point, since sustained heat above about 300 F, harsh solvents and direct sun all damage it, so quartz stays indoors.
Quartzite is natural stone too, quartz sandstone fused by heat and pressure. It is harder than granite, carries veining that reads like marble and needs sealing. A few stones sold as quartzite are really dolomitic marble and etch like marble, so it pays to know which kind a slab is before you buy it. Marble is the soft one. Lemon, vinegar and wine etch it, it scratches and it wears a patina over time, which is why people choose it for a vanity, a fireplace surround or a baking station, and for a kitchen when they like the patina. Porcelain comes in large, thin slabs with the pattern printed on the face. It resists heat, sun and stains, which makes it a strong choice outdoors, though a chip in porcelain is hard to repair.
How a job runs
Every job runs through the same steps with the same crew. It starts with a free estimate at the house. We look at the cabinets, the sink and the cooktop, bring samples of all five materials and give you a written price, with tear-out and the sink install as their own lines. Then you choose the stone. Granite, quartzite and marble are picked slab by slab at any stone yard: you send us a photo of the slab tag, and the slab is confirmed at template. Quartz and porcelain are picked from samples.
Once the cabinets are set and level, our templater comes back and records every wall, run and cutout with a digital template. Someone should be home for that visit, since seams and overhangs get settled on the spot. In our shop, we cut the slab to that template, polish the edges and cut the sink and cooktop openings.
On install day, the crew takes out the old tops and hauls them away, sets the new stone, fills the seams with color-matched epoxy, sets the sink and drills the faucet holes. Granite, quartzite and marble get their sealer before the crew leaves.
Older houses and older cabinets
In an older house, the cabinets under the old top may no longer be level, and the walls may not be square. We check every run with a level before the template, and the digital template records the walls as they are, so the stone is cut to the room and not to a drawing. A cabinet that needs shimming or a repair should be fixed before template day, since fixing it first saves a recut.
Tear-out and haul-away
If old tops are coming off, that happens at the start of the install visit, right before the new stone goes in, and an early tear-out is available on request. The sink and the faucet are disconnected first. The crew then lifts off the old laminate, tile or stone, protects the cabinets and the floor as it works, and hauls the old material away on our truck. Tear-out is its own line on the estimate, so you can see what it costs.
Builders, remodelers and commercial work
We also work for builders, remodelers, designers and property managers. Builders and remodelers give us the cabinet date, and we template once the boxes are set, then schedule the install around the other trades. Designers can send drawings with the estimate request, and we check them against the real walls at template. Restaurants, bars, offices and hotels get commercial counters cut in the same shop and set by the same crew. Apartment owners doing unit turns can repeat one material and one edge profile across every unit.
Where we work and how to start
Beyond Missouri City, our crew works across the rest of Fort Bend County, including Stafford, Meadows Place and Sugar Land.
If you are planning new countertops in Missouri City, send the estimate form or give us a call. We bring the samples, and you bring the questions.