La Porte has 1970s to 1990s brick ranch homes, and its neighborhoods include Fairmont Park, Fairmont Park West, Sylvan Beach, Morgan's Landing and Pecan Crossing. Near the bay, a brick ranch may have been through a hurricane or two, and cabinet boxes that have taken on water need replacing before stone goes on them.
The five stones we cut
We cut and install five materials, and each one fits a different kind of kitchen. Granite is natural stone, quarried mostly in Brazil and India. It handles normal pan heat and resists scratching well, and it needs a penetrating sealer. Quartz is engineered: about 90 percent ground quartz bound with resin and pigment. It never needs sealing, and its pattern holds from one slab to the next. The resin is its weak point, since sustained heat above about 300 F, harsh solvents and direct sun all damage it, so quartz stays indoors.
Quartzite is natural stone too, quartz sandstone fused by heat and pressure. It is harder than granite, carries veining that reads like marble and needs sealing. A few stones sold as quartzite are really dolomitic marble and etch like marble, so it pays to know which kind a slab is before you buy it. Marble is the soft one. Lemon, vinegar and wine etch it, it scratches and it wears a patina over time, which is why people choose it for a vanity, a fireplace surround or a baking station, and for a kitchen when they like the patina. Porcelain comes in large, thin slabs with the pattern printed on the face. It resists heat, sun and stains, which makes it a strong choice outdoors, though a chip in porcelain is hard to repair.
Edges and thickness
We cut ten edge profiles in our shop. Eased and beveled edges keep a clean, square line. Half bullnose and full bullnose round the front for a softer feel. Ogee and dupont add a curved, more formal shape. A chiseled edge looks rough on purpose, and a cove edge curves under the top. Mitered and laminated edges add a second strip of stone at the front, so the top reads thicker than the slab. For thickness, 3 cm is the standard for kitchens, and 2 cm is used for vanities or under a laminated edge. On 3 cm stone, an overhang deeper than 10 inches needs support brackets.
How a job runs
Every job runs through the same steps with the same crew. It starts with a free estimate at the house. We look at the cabinets, the sink and the cooktop, bring samples of all five materials and give you a written price, with tear-out and the sink install as their own lines. Then you choose the stone. Granite, quartzite and marble are picked slab by slab at any stone yard: you send us a photo of the slab tag, and the slab is confirmed at template. Quartz and porcelain are picked from samples.
Once the cabinets are set and level, our templater comes back and records every wall, run and cutout with a digital template. Someone should be home for that visit, since seams and overhangs get settled on the spot. In our shop, we cut the slab to that template, polish the edges and cut the sink and cooktop openings.
On install day, the crew takes out the old tops and hauls them away, sets the new stone, fills the seams with color-matched epoxy, sets the sink and drills the faucet holes. Granite, quartzite and marble get their sealer before the crew leaves.
Humidity, water and the coast
Humidity does not hurt stone, but it works on what sits under it: the cabinet boxes and the subtops. Near the water, we look at both before we template. If a house has been through a flood remodel, we template after the new cabinets are set, not before. Outdoor counters near the coast take salt air, full sun and storm-season rain, so they get granite, quartzite or porcelain, never quartz.
Before template day
A few decisions make template day go smoothly. The cabinets should be set, fastened and level. The sink model should be chosen and the cooktop or range model known, since their openings are cut in our shop from the template. Pick the faucet too, because it sets how many faucet holes the top needs. Decide on the overhang for any seating and on the backsplash height. Clear the counters and the sink base so the templater can reach every wall, and plan for someone to be home. A change after the template can mean a second template, so the layout is settled on the spot.
Where we work and how to start
Beyond La Porte, our crew works across the rest of Harris County, including Baytown, Deer Park and Taylor Lake Village.
If you are planning new countertops in La Porte, send the estimate form or give us a call. We bring the samples, and you bring the questions.